Airports / General Aviation / Paved
Paved airfield improvements matched to the operating scale.
General-aviation pavement decisions should reflect the actual aircraft mix, traffic, weather, funding and available closures.
Rigorous engineering without major-hub overreach.
Dromo can assess runway and taxiway geometry, surface condition, pavement distress, markings and drainage, then define targeted repair, rehabilitation, extension or monitoring. The investigation is sized to the owner’s decision and the operating consequence.
Construction phasing and return-to-use checks are planned around realistic availability rather than copied from an international-airport programme.
Cremona Migliaro / Construction intelligence
The same survey becomes a construction record and an analysis platform.
At Cremona Migliaro, aerial capture documented the paved runway extension while WHATSON™ converted the measured surface into specialist views for analysis, construction management and verification.


Connected capability
A practical paved-airfield pathway.
Aircraft & Traffic
Define the load and operating cases that matter.
02Condition & Geometry
Map defects, levels, transitions and operational constraints.
03Drainage
Trace ponding, edge saturation, erosion and maintainable outlets.
04Repair or Rehabilitation
Select local, staged or full interventions using measured evidence.
05Extension Interfaces
Coordinate old and new pavement, levels, water and markings.
06Operational Windows
Plan achievable works and verification around airfield use.
Continue through the Dromo system
Markets, services and evidence remain connected.
Technical evidence
Measured, modelled and verified.
Dromo project and technical archive. Images are selected for public-safe editorial use; confidential project data is excluded.

Target the constraint that limits the airfield.
Dromo can structure a survey, pavement, drainage, extension or rehabilitation assignment at the appropriate scale.
Discuss the requirement with Dromo