Circuit du Spa-Francorchamps

THE PROJECT

Dromo began a close collaboration with Spa-Francorchamps in 2021 as the circuit prepared a major safety and infrastructure programme connected with the return of international motorcycle endurance racing. The assignment required respect for one of motorsport’s most recognisable landscapes while coordinating new run-off areas, revised track edges and specialist pavement work around high-speed sections including Eau Rouge–Raidillon.

COUNTRY:

Belgium

TEAM LEADER:

Jarno Zaffelli

PROJECT TEAM:

Federico Vennarucci (Head of design),
Filippo Piccoli (Site Manager),
Orazio Bonassi (Pavement specialist),
Alberto Marzi
Elisabetta Maria Terenziani,
Lorenzo Bonezzi
Tatiana Rota.

CONTRACTOR:

Bodarwè

WORK:

Investigate, engineer and resurface

MIX:

LeNoir

YEAR:

2022

Project engineering in detail

Safety without erasing the circuit

At Spa, elevation, speed and limited visibility are inseparable from the identity of the lap. Safety work therefore had to be studied as a system of trajectories, run-off, barriers, gravel, asphalt and operational access. The objective was to accommodate both car and motorcycle requirements while retaining the sequences and compression that define the circuit.

A surface designed for the location

Dromo developed a dedicated asphalt mix called LeNoir for selected works at Spa, including the Eau Rouge–Raidillon area and the new Turn 9 section. Mix design, texture, level control and drainage had to be considered together because small surface differences become significant under the vertical and lateral loads generated through the circuit’s fastest changes of elevation.

Design and construction as one process

The project illustrates Dromo’s approach to existing circuits: survey and simulation guide the geometry; safety assessment defines the performance target; material engineering and site support carry that target into construction. On a venue with a dense calendar and international homologation requirements, coordination and verification are as important as the drawing itself.

Related Dromo capabilities

Project evidence

Verified project register

Surface, drainage, survey and development phases.

The project register documents multiple Spa-Francorchamps assignments; each is kept separate to preserve the scope of the individual phase.

Surface

Resurfacing and grooving

Records include 2022 and 2024 resurfacing, followed by a separate grooving assignment.

Water

Drainage works

Winter works in 2024 explicitly include drainage.

Development

Run-off, LiDAR and MotoGP study

Separate entries cover Turn 4 run-off, LiDAR survey and MotoGP feasibility analysis.

Project evidence

From the Dromo project archive.

Dromo project and technical archive. Images are selected for public-safe editorial use; confidential project data is excluded.

Completed specialist works at Spa-Francorchamps
Completed works at Spa-Francorchamps, where geometry, safety and surface delivery were coordinated.